Starting 8/12/23, traffic will be reduced to one 11’ lane in each direction onto the westbound half of the Hall Station Bridge (Bridge between Monroeville and Wilkins Township) while a Penn Dot contractor works on the eastbound side. This condition will last for about 1-1/2 months; then the contractor will switch again to work on the other half of the bridge for another 1-1/2 months. There are no closures or detours, but there will be a Construction Shuttle Bus operating from 6:00 AM to 10:00 PM for this first phase because the sidewalk will be closed. The shuttle will transport the pedestrians to and from the two intersections.